PKB Engages 150 OSIS Students from Jabodetabek, Learning Political Awareness from an Early Age
-
News
-
3 minutes ago
This article was translated by AI. Read the original article on Kompas.com. See Original
There is also the risk of crowding out, which occurs when government deficit financing raises demand for funds in financial markets, driving up borrowing costs, and under certain conditions, reducing the private sector's access to financing.
This risk does not occur automatically with every deficit but becomes a crucial consideration as the state's financing needs grow.
Therefore, halting or postponing projects whose economic benefits do not justify their financing costs is not an anti-development move. On the contrary, it is a form of public economic discipline.
Experiences from other countries provide lessons that governments do not need to uphold a project solely because it has been announced, contracted, or has consumed a budget.
One current example is the cancellation of the East West Link infrastructure project in Melbourne, Australia, in 2015.
The newly elected Victorian government decided to halt the toll road project after changing policy.
The project, initially estimated to require over AUD 22.8 billion in investment over its implementation period, was ultimately canceled.
However, the cancellation did not come without costs.
The Victorian government faced termination costs estimated to exceed AUD 1.1 billion, including land acquisition, planning, and contract resolution costs.
The Auditor-General of Victoria also criticized the weak basis of the project's feasibility study and found that previous important decisions were driven more by political urgency than by economic benefits.
The crucial lesson is not that every expensive project must be canceled.
Rather, the government should rationally compare the costs of continuing the project against the costs of halting it.
In the investment economic perspective, there is the concept of sunk cost fallacy, which refers to the fallacy of maintaining a decision solely because money has already been spent.
In fact, past expenditures should not be the main reason for allocating new funds. Every decision should base on future marginal benefits and costs.
If the economic benefits of continuing the project are smaller than the additional costs, delaying, scaling down, or canceling may be more rational options.
Australia demonstrates that policy corrections require calculations.
Even stopping a project can cause significant contractual losses.
Thus, Indonesia needs to conduct a comprehensive evaluation of all IKN investment components rather than making decisions based solely on political sentiments.
Let’s not allow IKN to become a monument of ambitious development standing firmly on a fragile fiscal foundation.
Because, in development economics, the success of a government is not measured by how many projects it leaves behind but by how much welfare it has successfully passed on to the next generation.