Amran and Sugiono as Vice Presidential Candidates, Mardani: PKS's Stance Follows Prabowo's Coalition
-
News
-
14 minutes ago
This article was translated by AI. Read the original article on Kompas.com. See Original
JAKARTA, KOMPAS.com - PT KAI's President Director Bobby Rasyidin announced that the company will focus on utilizing domestically manufactured trains after deciding to cancel the import of used commuter trains from Japan.
Bobby stated that KAI will use trains produced by INKA to expand its commuter train fleet.
"Part of the order will go to INKA. We must support the domestic industry," Bobby said at the Presidential Palace in Jakarta on Thursday (5/11/2026).
"Foreign collaboration is necessary, but we must work with local industries," he added.
Bobby mentioned that they require a total of 23 trainsets, which are expected to be produced within 2-3 years.
However, KAI currently needs 8 trainsets that can be operated immediately.
"It's a significant requirement. We have an urgent need for 8 trainsets, then a total of 23 trainsets. We will expedite the process to 2-3 years for the new 23 trainsets," he added.
Commission VI of the Indonesian House of Representatives (DPR RI) approved PT Kereta Api Indonesia (Persero)'s proposal to import used commuter train units from Japan.
This decision was made to meet the increasing passenger capacity needs.
The approval was announced by Commission VI Deputy Chairman Andre Rosiade during the summary of the hearing (RDP) with KAI on Wednesday (23/9/2026).
"Commission VI encourages KAI to address the capacity needs of railway transport, especially for Jabodetabek commuter trains, by enhancing the local industry and importing integrated and sustainable used trainsets," Andre stated.
During the meeting, KAI's President Director Bobby proposed the import of used trains from Japan as a temporary solution to meet the transportation needs, particularly for Jabodetabek commuter trains.
According to him, the import of used trains is necessary as a transition solution to fulfill operational needs for a certain period while strengthening the domestic railway industry.
"This is a bridging solution to satisfy the operational needs today, with maximum utilization over the next ten years, by importing used trains from Japan," Bobby explained.
He noted that the proposal for importing used trains from Japan is due to the compatibility of their railway systems with that of Indonesia.
This compatibility includes track system, gauge width, as well as the electrical system and overhead line (LAA) used.
"Our railway system here is compatible with the railway system in Japan. We cannot import from elsewhere because the systems are different," he concluded.