The Fate of IKN After Being Excluded from the Government Work Plan
-
News
-
33 minutes ago
This article was translated by AI. Read the original article on Kompas.com. See Original
JAKARTA, KOMPAS.com - Minister of Home Affairs Tito Karnavian and his entourage used the Indonesian Air Force Caracal EC-725/H225M helicopter H-2210 to inspect several border regions in North Kalimantan (Kaltara) on October 6-7, 2026.
This inspection followed a visit by Defense Minister Sjafrie Sjamsoeddin to several border areas in Kaltara on October 2-3, 2026.
“The movement (of the Minister and his entourage) to regions with limited land access utilized the Caracal EC-725/H225M helicopter piloted by Captain Pnb Brian,” stated the Indonesian Air Force on Thursday (October 8, 2026).
During the visit, Tito assessed locations ranging from the Semamu Road in Mentarang Hulu District, Malinau Regency, to infrastructure in the border areas of Nunukan Regency.
Key sites included the provincial road and bridge in Long Katung Village, the national road in Kampung Baru Village, and prospective sites for the Border Crossing Post (PLBN) in Long Midang, Krayan, Nunukan Regency.
“The inspection revealed several road sections still in severe disrepair and not fully connected,” the statement elaborated.
In the Malinau and Krayan border area, land access remains characterized by dirt roads that are interrupted at various points.
Meanwhile, river access heavily relies on water levels.
“This geographical condition poses challenges in establishing connectivity among regions,” according to the statement from Anang Busra Tarakan Air Base Information Service.
One route drawing government attention is the Krayan Loop.
This route is planned to connect the border area through PLBN Long Midang/Krayan, Labang, Sei Pancang, and Long Nawang, as well as linking Malinau, Long Pujungan, and Long Kemuat.
A similar situation is observed on the 177.32-kilometer Apau Kayan Road.
This road can only function optimally during the dry season.
“Approximately 120.9 kilometers are still dirt, and 29 kilometers are made of aggregate; therefore, during the rainy season, the road becomes slippery, muddy, and very difficult for vehicles to traverse,” it explained.
Nevertheless, several main routes have been connected, including Mensalong-Tao Lumbis and Long Pujungan-Malinau, measuring 27.05 kilometers and 25 kilometers respectively.
The inspection also identified various government development plans aimed at enhancing connectivity in border areas.
“These include the construction of the Krayan-Malinau national road linking Nunukan and Malinau regencies and the establishment of PLBN Long Midang in Long Midang Village, Krayan District,” he stated.
“Additionally, the construction of dams and irrigation systems to support agricultural sectors, planned to be executed by the central government,” he added.
Meanwhile, the construction of a bridge in Long Katung Village and the provincial road from Point 0 in front of Yuvai Semaring Long Bawan Airport to Long Katung Village is planned to be carried out by the Nunukan Regency Government.
The Commander of Anang Busra Air Base, Major General of the Indonesian Air Force Andreas A. Dhewo, stated that the presence of the central government in the border areas generates accurate data on community needs.
“Anang Busra Air Base, as an extension of the Indonesian Air Force Headquarters, is ready to support the central government's agenda to open connectivity for communities in border and remote areas, including the use of defense and security equipment owned by the Indonesian Air Force,” he concluded.